Works are now under way to repave Norwood Road. The community-led Streetworks project came up with the design plans to change and improve Norwood Road following a series of workshops with local people.
The project is funded by Transport for London (TfL) who have set aside £7m to upgrade Norwood Road in West Norwood and the one-way system (gyratory) at Tulse Hill over a period of 5 years.
To find out more about what is happening and the next steps for changing the Tulse Hill one-way system do come along to one of the workshop style public meetings on Tuesday 28th Feb 6.30-8.30pm at City Heights Academy 3 Abbots Park SW2 3PW or on Tuesday 7th March
6.30-8.30pm at the Salvation Army 246 Norwood Rd SE27 9AW http://streetworksN2T.eventbrite.com